Scope of Works: To bulk excavate underneath existing dwelling to create a rumpus/entertaining room.

 

Martin’s Comments: This was a challenging job with high detailed requirements which required very careful planning. We had to excavate nearly 400 tonne of sand from underneath the existing dwelling and as access was tight at the side (760mm wide), we were limited in the machinery we could use. We built special ramps and managed to squeeze a mini excavator down the side of the house and then all sand was manually drawn away using wheel barrows.

 

Even though the job was demanding, this was a fantastic project to work on and we are very proud of the finished product.

 

Owner's Comments: The owner's were thrilled with the final result. (Read Richard & Ellen's testimonial here)

 

STAGE 1: Site Establishment

  1. Site set out
  2. Shoring and piling works
  3. Build special ramps to access the site
  4. Bulk excavation and removal of sand
  5. Formation of new footings  

 (click on image to enlarge) 

 

 

e2.JPG
e5.jpg
e6.jpg
e7.png
e8.jpg
e9.jpg
e10.jpg
e12.jpg

 

 

 

STAGE 2: Concrete 

 

(click on image to enlarge) 

 

 

e16.jpg
e17.jpg
e18.jpg
e19.jpg

 

 

 

STAGE 3: Brickwork and Blockwork

 

(click on image to enlarge) 

 

 

e20.jpg
e21.jpg
e22.jpg
e23.jpg
e24.jpg
e25.jpg
e27.jpg
e28.jpg

 

 

 

STAGE 4: Internal Fixings

 

Floorboards installed, all internal architraves, skirtings, doors installed 

 

(click on image to enlarge) 

 

 

e29.jpg
e30.jpg
e31.jpg
e33.jpg
e34.jpg
e35.jpg
e32.png

 

 

 

 

STAGE 5:

 